logo
  • Home
  • Articles & Issues
    • Current
    • All Issues
  • About
    • Aims and Scope
    • Editorial Board
    • Indexing
  • For Authors
    • Submission
    • Terms of Publication
    • Formatting Guidelines
    • Peer Review Process
    • License Agreement
    • Charges and Financing
  • Ethics & Policies
    • Publication Ethics
    • Conflict of Interest
    • Open Access Policy
    • Archiving
    • Complaints Policy
    • Privacy Statement
    • Corrections and Retractions
    • Anti-plagiarism Policy
    • Generative AI Policy
  • Contacts
  • en
    • Українська

Ecological Safety and Balanced Use of Resources

  • Submit an article
  • Home
  • Articles & Issues
    • Current
    • All Issues
  • About
    • Aims and Scope
    • Editorial Board
    • Indexing
    • Sources of Financing
  • For Authors
    • Submission
    • Terms of Publication
    • Formatting Guidelines
    • Peer Review Process
    • Article Processing Charges
    • License Agreement
  • Ethics & Policies
    • Publication Ethics
    • Conflict of Interest
    • Open Access Policy
    • Archiving
    • Complaints Policy
    • Privacy Statement
    • Corrections and Retractions
    • Anti-plagiarism Policy
    • Generative AI Policy
  • Search
  • Contacts

Article

Modeling the process of mine water clarification using improved purification technology for water disposal conditions of operating coal mining eenterprise

Dariia Kulikova
Abstract

The main difference between mine waters, which makes it difficult to clean them, is the presence of finely dispersed (less than 10 microns) aggregate-resistant coal and rock particles, the amount of which can be 50-70% of the total mass of mechanical impurities. Suspended solids that are contained in mine water play a significant role in the contamination of nearby surface water bodies, since they either contain many chemical pollutants or adsorb heavy metals, which indicates the importance of effective mine water settling. Modeling of the mine water clarification process using an improved treatment technology for the conditions of wastewater disposal of an operating coal mining enterprise (Stepova mine of DTEK Pavlohradcoal Private Joint-Stock Company) through the introduction of a horizontal sedimentation tank of a modernized design was carried out. Dependences (in the form of graphs and regression equations) between the depth of particle settling depending on their the different hydraulic size in the proposed sedimentation tank of an improved design, its length and the efficiency of clarification of mine water after its treatment with a coagulant solution (aluminum sulfate) have been established. Using these dependencies, it is possible to determine the value of the expected efficiency of mine water clarification and the hydraulic particle size of suspended particles that can settle to the bottom at the end wall of the proposed sedimentation tank. The overall efficiency of mine water clarification, which is pumped to the surface by the Stepova mine, after treatment in a modernized sedimentation tank and post-treatment in a mine water storage pond, will be 90-91% of the initial concentration of suspended solids. The final concentration of mechanical impurities after treatment according to the proposed improved technology does not exceed the maximum allowable standard for water bodies for cultural and community purposes in terms of the content of suspended solids

Download article

Received 25.03.2022

Revised 10.08.2022

Accepted 28.11.2022

https://doi.org/10.31471/2415-3184-2022-2(26)-133-142
Retrieved from Vol. 13, No. 2, 2022
Pages 133-142

Suggested citation

Kulikova, D. (2022). Modeling the process of mine water clarification using improved purification technology for water disposal conditions of operating coal mining eenterprise. Ecological Safety and Balanced Use of Resources, 13(2), 133-142. https://doi.org/10.31471/2415-3184-2022-2(26)-133-142

References

[1] DSanPiN 8.8.1.2.3.4-000-2001. (2001). Permissible doses, concentrations, quantities and levels of pesticides in agricultural raw materials, foodstuffs, work area air, atmospheric air, water, and soil. Retrieved from https://zakon.rada.gov.ua/rada/show/v0137588-01#Text.

[2] Kharionovsky, A. (2000). Complex purification of mine and quarry waters from anthropogenic contaminants. Shakhty: YURO AGN Publishing House.

[3] Vyhovska, D., Vyhovskyi, D., & Pikulova, T. (2012). Technological features of mine water treatment. Bulletin of Donetsk Mining University, 1(30), 78-83.

[4] Hulko, S., & Homal, I. (2013). Analysing the composition and condition of hydraulic structures of coal mines. Bulletin of Donetsk Mining University, 1(32), 78-84.

[5] Kryvoshchekov, V., & Chutcheva, A. (2013). The problem of mine water treatment and the direction of its solution. Mineral Processing, 55(96).

[6] Voron, L., Lange, L., & Blahorazumova, A. (2015). Problems of mine water treatment. Bulletin of the Siberian State Industrial University, 2(12), 76-79.

[7] Horshkov, V. (1981). Purification and utilisation of waste water from coal industry enterprises. Moscow: Nedra.

[8] Vitrenko, L., & Serhienko, S. (1973). New technological schemes of mine water treatment in Donbass. Scientific Works of VNIIOSuhol, 16, 73-85.

[9] VNIIOSuhol. (1986). Technological schemes of treatment from suspended substances and mine water disinfection. Perm: VNIIOSuhol.

[10] Kolesnyk, V., Kulіkova, D., & Kovrov, S. (2013). In-stream settling tank for effective mine water clarification. In Mining of mineral deposits (pp. 285-289). London: CRC Press.

[11] Kolesnyk, V., & Kulikova, D. (2013). Justification of quantity perforated partitions and intervals their placement in improved sedimentation tank of mine water. Scientific Bulletin of the National Mining University, 4, 92-98.

[12] Kolesnyk, V., Kulikova, D., & Pavlychenko, А. (2016). Substantiation of rational parameters of perforated area of partitions in an improved mine water settling basin. Scientific Bulletin of the National Mining University, 6, 120-127.

[13] Kolesnyk, V., & Kulikova, D. (2013). The sequence of development of the algorithm and calculating the basic design parameters of the proposed waste water settle. Energy Technologies & Resource Saving, 1, 48-56.

[14] Horova, A., Kolesnyk, V., & Kulikova, D. (2012). Physical modeling of precipitation process of the suspended materials in physical model of sedimentation tank for mine water treatment. Scientific Bulletin of the National Mining University, 3, 92-98.

Ivano-Frankivsk National Technical University of Oil and Gas 76019, 15 Karpatska Str., Ivano-Frankivsk, Ukraine

  • mail@esbur.com.ua publisher@nung.edu.ua